Bosnia and Herzegovina vs Libya: Crude steelmaking capacity

Bosnia and Herzegovina
1.8 Tonnes
in 2025
Libya
1.65 Tonnes
in 2025
Bosnia and Herzegovina rank
49th
Libya rank
52nd

Crude steelmaking capacity over time

  • Bosnia and Herzegovina
  • Libya
00.511.52200020122025

How they compare

Bosnia and Herzegovina currently reports 1.8 Tonnes against 1.65 Tonnes in Libya, a difference of 0.15 Tonnes.

That makes Bosnia and Herzegovina's figure about 1.1 times Libya's.

The two have swapped places 1 time across 26 shared years of data; in 2000 it was Libya ahead.

Bosnia and Herzegovina ranks 49th and Libya ranks 52nd of 115 countries.

Across the 3 decades both report, Bosnia and Herzegovina averaged higher in 2 and Libya in 1.

Head to head by decade

Decade Bosnia and Herzegovina Libya Difference Ahead
2000s 0.36 Tonnes 1.39 Tonnes 1.03 Tonnes Libya
2010s 1.8 Tonnes 1.65 Tonnes 0.15 Tonnes Bosnia and Herzegovina
2020s 1.8 Tonnes 1.65 Tonnes 0.15 Tonnes Bosnia and Herzegovina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher crude steelmaking capacity, Bosnia and Herzegovina or Libya?
Bosnia and Herzegovina, at 1.8 Tonnes against 1.65 Tonnes in Libya as of 2025.
What is the difference in crude steelmaking capacity between Bosnia and Herzegovina and Libya?
0.15 Tonnes, with Bosnia and Herzegovina ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Libya?
26 years are reported by both, from 2000 to 2025.
How do Bosnia and Herzegovina and Libya rank globally for crude steelmaking capacity?
Bosnia and Herzegovina ranks 49th and Libya ranks 52nd of 115 countries.
Where does this data come from?
Organisation for Economic Co-operation and Development, published as Crude steelmaking capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Libya: Crude steelmaking capacity. Statizoid, drawing on Organisation for Economic Co-operation and Development. Retrieved 03 September 2026, from https://urban.statizoid.com/compare/crude-steelmaking-capacity/bosnia-and-herzegovina/libya/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under OECD Terms and Conditions (attribution required); please keep the attribution.

<a href="https://urban.statizoid.com/compare/crude-steelmaking-capacity/bosnia-and-herzegovina/libya/">Bosnia and Herzegovina vs Libya: Crude steelmaking capacity</a> — Statizoid

About this data

Indicator
Crude steelmaking capacity
Unit
Tonnes
Source
Organisation for Economic Co-operation and Development
Licence
OECD Terms and Conditions (attribution required)
Coverage
132 places, 3,432 data points, 2000–2025
Last refreshed

This dataset provides information on crude steelmaking capacity for 132 OECD Member countries and non-OECD economies over the period 2000–2025. Definitions Steelmaking capacity Nominal crude steelmaking capacity is defined as the maximum theoretical output of installed steelmaking equipment. This definition does not account for yield losses, maintenance downtime, or other factors affecting actual production. As a result, the steelmaking capacity figures provided by the OECD should not be interpreted as effective capacity. Capacity is expressed in million metric tonnes (mmt). Annual capacity figures reflect all steelmaking capacity existing at the end of each calendar year. Steelmaking equipment Steelmaking equipment includes all equipment used to produce crude steel. The definition excludes ironmaking equipment, which is considered upstream, as well as casting, rolling, and finishing equipment, which are considered downstream. Specifically, crude steelmaking equipment includes electric arc furnaces (EAF), induction furnaces (IF) and LD basic oxygen furnaces (BOF). Methodology Steelmaking capacity developments are derived from data on existing capacity, investments, and closures. Capacity changes reflect new additions and permanent closures and therefore represent net changes. In some cases, capacity may be overestimated due to the assumption that projects classified as underway with expired start dates have become operational. Only permanent closures are included in capacity calculations, although some closures cannot be clearly classified due to limited available information. Data sources OECD calculations based on desk research, company websites, publicly available news sources and information exchanges within the OECD Steel Committee. Cite this dataset OECD (2025). Crude steelmaking capacity dataset. Accessed on [Day Month Year]. Further information OECD Steel Outlook 2025 OECD Steel Committee Global Forum on Steel Excess Capacity For questions or comments regarding this dataset, please contact Maika Sakamoto (Maika.SAKAMOTO@oecd.org) or Masanobu Nakamizu (Masanobu.NAKAMIZU@oecd.org).