Taiwan, China vs United Kingdom: Crude steelmaking capacity

Taiwan, China
29.42 Tonnes
in 2025
United Kingdom
7.3 Tonnes
in 2025
Taiwan, China rank
9th
United Kingdom rank
6th

Crude steelmaking capacity over time

  • Taiwan, China
  • United Kingdom
51015202530200020122025

How they compare

Taiwan, China currently reports 29.42 Tonnes against 7.3 Tonnes in United Kingdom, a difference of 22.12 Tonnes.

That makes Taiwan, China's figure about 4.0 times United Kingdom's.

Across all 26 years both countries report, Taiwan, China has been ahead every year.

Taiwan, China ranks 9th and United Kingdom ranks 6th of 115 countries.

Taiwan, China has averaged higher in every one of the 3 decades both report.

Head to head by decade

Decade Taiwan, China United Kingdom Difference Ahead
2000s 21.5 Tonnes 17.89 Tonnes 3.61 Tonnes Taiwan, China
2010s 28.67 Tonnes 15.6 Tonnes 13.07 Tonnes Taiwan, China
2020s 29.42 Tonnes 10.5 Tonnes 18.92 Tonnes Taiwan, China

Averages of every year both report within each decade.

Frequently asked questions

Which has higher crude steelmaking capacity, Taiwan, China or United Kingdom?
Taiwan, China, at 29.42 Tonnes against 7.3 Tonnes in United Kingdom as of 2025.
What is the difference in crude steelmaking capacity between Taiwan, China and United Kingdom?
22.12 Tonnes, with Taiwan, China ahead.
How many years of comparable data are there for Taiwan, China and United Kingdom?
26 years are reported by both, from 2000 to 2025.
How do Taiwan, China and United Kingdom rank globally for crude steelmaking capacity?
Taiwan, China ranks 9th and United Kingdom ranks 6th of 115 countries.
Where does this data come from?
Organisation for Economic Co-operation and Development, published as Crude steelmaking capacity. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Taiwan, China vs United Kingdom: Crude steelmaking capacity. Statizoid, drawing on Organisation for Economic Co-operation and Development. Retrieved 24 August 2026, from https://urban.statizoid.com/compare/crude-steelmaking-capacity/taiwan/united-kingdom-2/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under OECD Terms and Conditions (attribution required); please keep the attribution.

<a href="https://urban.statizoid.com/compare/crude-steelmaking-capacity/taiwan/united-kingdom-2/">Taiwan, China vs United Kingdom: Crude steelmaking capacity</a> — Statizoid

About this data

Indicator
Crude steelmaking capacity
Unit
Tonnes
Source
Organisation for Economic Co-operation and Development
Licence
OECD Terms and Conditions (attribution required)
Coverage
132 places, 3,432 data points, 2000–2025
Last refreshed

This dataset provides information on crude steelmaking capacity for 132 OECD Member countries and non-OECD economies over the period 2000–2025. Definitions Steelmaking capacity Nominal crude steelmaking capacity is defined as the maximum theoretical output of installed steelmaking equipment. This definition does not account for yield losses, maintenance downtime, or other factors affecting actual production. As a result, the steelmaking capacity figures provided by the OECD should not be interpreted as effective capacity. Capacity is expressed in million metric tonnes (mmt). Annual capacity figures reflect all steelmaking capacity existing at the end of each calendar year. Steelmaking equipment Steelmaking equipment includes all equipment used to produce crude steel. The definition excludes ironmaking equipment, which is considered upstream, as well as casting, rolling, and finishing equipment, which are considered downstream. Specifically, crude steelmaking equipment includes electric arc furnaces (EAF), induction furnaces (IF) and LD basic oxygen furnaces (BOF). Methodology Steelmaking capacity developments are derived from data on existing capacity, investments, and closures. Capacity changes reflect new additions and permanent closures and therefore represent net changes. In some cases, capacity may be overestimated due to the assumption that projects classified as underway with expired start dates have become operational. Only permanent closures are included in capacity calculations, although some closures cannot be clearly classified due to limited available information. Data sources OECD calculations based on desk research, company websites, publicly available news sources and information exchanges within the OECD Steel Committee. Cite this dataset OECD (2025). Crude steelmaking capacity dataset. Accessed on [Day Month Year]. Further information OECD Steel Outlook 2025 OECD Steel Committee Global Forum on Steel Excess Capacity For questions or comments regarding this dataset, please contact Maika Sakamoto (Maika.SAKAMOTO@oecd.org) or Masanobu Nakamizu (Masanobu.NAKAMIZU@oecd.org).